Private Residence “I know how long it takes to heat up the big zone in my basement, usually about a half hour or maybe 40 minutes. After starting up the system for the first time, I walked away, came back about 10 minutes later, and the boiler was off and at high limit. It cut the time it took to heat that thermal fluid by 60%. That was impressive.”